SK-Spectrum successfully completes detail design of 4-inch gas lift and gas injection pipelines and risers.   SK-Spectrum successfully completes design of 38-inch subsea spools.   SK-Spectrum successfully completes FEED of Methanol, Ammonia and LPG pipelines.   SK-Spectrum successfully completes FEED of 12-inch gas pipeline.   SK-Spectrum successfully completes FEED of LPG transfer pipelines.

Project Information

Hazteck Global Solutions FZC, United Arab Emirates have been appointed Consultant by Meliora Methanol Ltd, Aleto, and Port Harcourt, Nigeria for rendering Consultancy Services for their Project – Underwater Ammonia and Methanol Pipelines Project in Nigeria.

Indorama operates a large-scale Petrochemical and Fertilizer complex at Port Harcourt, Nigeria. They are a leading producer of Urea (nitrogenous fertilizer), Polypropylene (PP) and Polyethylene (PE) in the sub-Saharan Africa.

Indorama Eleme Petrochemicals Limited (IEPL), the Petrochemicals division, produces 350 Kilo Tons of Polymer (PE & PP) annually, utilizing Natural Gas Liquids as feedstock. Indorama Eleme Fertilizers & Chemicals Limited (IEFCL), operates two Ammonia & Urea trains (2,300 TPD Ammonia & 4,000 TPD Urea each) with a combined annual production capacity of 2.8 million Tons of Urea.

In line with the planned expansion / diversification projects, they intend to set up a Methanol & Ammonia co-production facility in Port Harcourt, Nigeria. This site is located close to a creek and will have a dedicated Jetty, about 20 kms away, for the product evacuation. The manufacturing site & storage tanks need to be connected to the jetty through underwater pipelines to transport the products.

As part of this project, wall thickness calculations, on-bottom stability analysis and pipeline routing has been performed.

01

Client

Great Waters Maritime/Indorama

03

Date

02

Our Role

Engineering

04

Status

Horizontal Spool (Abaqus FE Model)

Picture6