Project Information
We are currently working on Detail engineering of Gas Lift and Gas Injection EPIC project. The project involves complete engineering design of the subsea pipelines (2 Nos.), risers (4 Nos.) and spools. As part of the project the design deliverables such as company specifications, datasheets, drawings and procedures were prepared. The project has 12 months engineering schedule. After having successfully completed the detail design activities, installation support is being provided to the EPC contractor.
Client
Confidential
Date
Our Role
Engineering
Status